The five most common risk prediction methods for water utilities – and how they compare

The five most common risk prediction methods for water utilities – and how they compare

In this guest article, Jim Fitchett compares five risk prediction methods widely used by water utilities, highlighting their advantages, drawbacks, and best uses. Jim is an adjunct instructor at Harvard University and co-founder of VODA.ai.

For decades, the single most pressing issue for water utilities has been the health of buried water pipes. Water loss from pipe failure is a significant challenge for all utilities. Every year, utilities lose between 20% to 60%, and that loss occurs after the expense of sourcing, treating, and distributing the water. The cost doesn’t stop at the water itself. Burst pipes damage property and roads, disrupt neighborhoods, contribute to unnecessary greenhouse gas emissions, and tarnish public trust.  

With limited budgets and failing infrastructure, utility leaders must make difficult choices about where to act first. That’s where risk prediction comes in. Utilities employ a variety of approaches to prioritize asset management based on predicted risk. These approaches are outlined below with their respective strengths and weaknesses.   

 

1. Asset condition assessment combined with failure likelihood scoring

Method: 

  • Combine field inspections, condition ratings, and engineering judgment to assign each asset (pipes, pumps, valves) a “likelihood of failure” (LoF) score.
  • Often paired with “consequence of failure” (CoF) to produce a risk score = LoF × CoF.

Strengths: 

  • Simple, well-understood, and fits regulatory asset management frameworks. 
  • Works with limited historical data. 

Weaknesses: 

  • Subjective if based heavily on staff opinion. 
  • Misses subtle risk patterns without deep data analysis. 

Best for: Smaller to mid-size utilities or as a first step toward predictive modeling. 

 

2.Statistical analysis

Method: 

  • Use statistical failure models (e.g., Weibull distribution, exponential decay, remaining useful life) to estimate the probability of failure based on asset age, material, environment, and historical break rates. 

Strengths: 

  • Quantitative, data-driven, and adaptable to different asset classes. 
  • Good balance between rigor and feasibility.

Weaknesses: 

  • Requires several years of good-quality failure records. 
  • May oversimplify complex, multi-factor failures. 

Best for: Utilities with a decade+ of work orders and failure history. 

 

3. Predictive modeling using AI/machine learning

Method: 

  • Train machine learning model algorithms (e.g., random forest, gradient boosting, neural networks) on asset, operational, and environmental data sets to predict pipe failures. 
  • Can integrate SCADA data, soil corrosivity maps, weather patterns, and pipe-level attributes. 

Strengths: 

  • Can uncover hidden patterns and non-linear relationships. 
  • Often more accurate than traditional models once tuned. 
  • Can predict failures in pipes with no previous breaks. 

Weaknesses: 

  • Needs consistent logging of pipe failures for model training.
  • This approach requires specialized skills and ongoing model maintenance.

Best for: Utilities with technology-forward leadership. 

 

4. Hydraulic and water quality simulation risk modeling

Method: 

  • Use hydraulic network models (e.g., EPANET, InfoWater) to simulate how failures would impact service levels, pressure, and water quality. 
  • Risk is assessed by combining failure probability with modeled service and quality impacts. 

Strengths: 

  • Directly connects asset condition to customer service impact. 
  • This is useful for scenario planning and emergency response planning.

Weaknesses: 

  • Requires a calibrated network model. 
  • Focused on impact modeling rather than failure prediction itself. 

Best for: Utilities wanting to prioritize based on service-criticality rather than just likelihood of failure. 

 

5. GIS-based multi-criteria risk mapping

Method: 

  • Overlay spatial datasets (pipe age, soil corrosivity, leak history, proximity to critical facilities) in GIS to create risk “heat maps.” 

Strengths: 

  • Visually intuitive for decision-makers and field crews. 
  • Can integrate with work order systems and capital planning. 

Weaknesses: 

  • Often more descriptive than predictive. 
  • Weighting of criteria can be subjective. 

Best for: Communicating risk to stakeholders and identifying priority areas. 

 

How the Five Risk Prediction Methods Stack Up  

Method Data Requirements Accuracy Cost Practicality Typical Utility Size
Asset Condition + LoF/CoF Low Low–Medium  Low High Small–Medium
Statistical Analysis Medium Medium Medium  Medium–High Medium–Large
AI /Machine Learning Medium–High High Medium–High  Medium  All sizes
Hydraulic Impact Modeling Medium–High  Medium Medium–High Medium  Medium–Large 
GIS Risk Mapping Medium Medium  Medium  High  All sizes 

 

In conclusion

Every utility operates with limited resources, and every utility deals with infrastructure failures. But not every utility predicts it well. The better you can predict risk to prioritize resources, the better you can prevent damage, reduce cost, and preserve trust.

Among all five risk prediction methods, machine learning provides the highest accuracy for predicting failures. It works by applying multiple algorithms to lots of data.

If you are ready to get more out of your data, start the process by improving its quality and quantity. Then, partner with experts – and leverage new tools such as CivilSense™ – to unlock the best insights that help you stay ahead of failure. 

This article was originally published by VODA.ai, and is reproduced here with permission. 

 