January 8, 2026

OneLift™ Turnkey Package Pump Station: The Smarter, Faster Solution for Wastewater & Stormwater Infrastructure

OneLift™ Turnkey Package Pump Station: The Smarter, Faster Solution for Wastewater & Stormwater Infrastructure

Traditional pump station installations often involve two separate structures: a wet well and a valve vault.

This can lead to challenges like complicated stepped excavations, larger excavation requirements, extended installation timelines, and differential settlement. 

 

Revolutionizing Pump Station Design

Oldcastle Infrastructure’s OneLift™ Pump Station changes the game with its single-structure design and integral valve vault. OneLift offers a turnkey solution that installs in less than a day, reduces footprint by up to 50%, and eliminates the risks associated with conventional systems.

 

Why Choose OneLift?

The OneLift Pump Station is engineered for efficiency, reliability, and simplicity. Here’s why it stands out:

  • Single-Structure Design: Integral valve vault built into the wet well’s top portion.
  • Rapid Installation: Factory pre-assembled components allow installation in under 4 hours, saving on crane time and site dewatering.
  • Smaller Footprint: Ideal for sites with tight space constraints.
  • Reduced Excavation: Less digging & sheeting means lower costs and faster project timelines.
  • Sole-Source Responsibility: OneLift provides a complete package with a single point of accountability.

 

Key Features

The OneLift Pump Station includes patented structural modules with rounded corners and sloped interior fillets in the base to prevent solids accumulation and improve flow. Its integral buoyancy footing prevents flotation without relying on external tie down, ensuring stability even in high groundwater conditions.

The near-rectangular shape provides more storage volume while allowing thinner, lighter walls for easier handling and installation. Each station is factory-built from stocked components of various heights to meet specific jobsite needs, enabling rapid factory assembly and disassembly for shipping.

 

Pre-Assembled for Speed

OneLift comes as a fully pre-assembled package, including all mechanical and electrical components prior to delivery. Oldcastle Infrastructure provides commissioning, operator training, and a complete warranty, meaning that your pump station can be installed in as little as four hours—dramatically reducing labor costs and project timelines.

 

Performance You Can Trust

The OneLift Pump Station is more than just a structural innovation; it’s a proven comprehensive solution designed for efficiency, reliability, and ease of maintenance. By integrating the valve vault into the wet well, OneLift eliminates unnecessary complexity and delivers a system that is both space-saving and cost-effective.

 

Learn more

Insight by: