September 27, 2018

OKLAHOMA DEPARTMENT OF TRANSPORTATION

Weigh Station Buildings Project

DESIGN & CONSTRUCTION TEAM

General Contractor: Telco Supply Co., Sulphur, OK
Owner: Oklahoma Dept. of Transportation
Precaster: Oldcastle Infrastructure
Manufacturing Facility: Oldcastle Infrastructure, Newnan, Georgia
Construction Services: Provided by Oldcastle Services

The Oklahoma DOT (ODOT) is constructing new state-of-the-art commercial truck weigh and inspection stations for heavy trucks entering Oklahoma. A total of nine POE weigh stations will be built along major highway entrances around the state’s border.

The $100 million dollar project consists of building eight permanent, manned stations at key ports of entry into Oklahoma, along with a ninth unmanned “virtual” station that will allow regulators to use special equipment to weigh and check trucks as they move along the highway.

CONSTRUCTION CHALLENGE

In collaboration with Telco Supply Company and the Oklahoma State DOT, Oldcastle Infrastructure provided a “turnkey” solution for the ODOT Port of Entry Precast Weight Station Buildings. Oldcastle Infrastructure’s turnkey scope of work consisted of the manufacturing, outfitting and installation of (2) two RCS 13830 Precast Concrete POE Buildings.

PRECAST SOLUTION

The ODOT, using metal office trailers in the past, knew it was essential, going forward, to provide a more secure and durable building to house the DOT employees that weigh and regulate the trucking industry on Oklahoma’s highways. They chose precast concrete construction as the solution.

The turnkey project involved the manufacturing and complete out-fitting of Oldcastle Infrastructure’s RCS 13830 Precast Concrete Buildings with all specified equipment. In addition, the fully out-fitted buildings were shipped, off loaded and installed at the POE sites near Oklahoma City. The RCS 13830 Precast Concrete Buildings were manufactured at our Newnan, GA facility.

SCOPE OF WORK

Precast Structure
A. STRUCTURE ENGINEERING
Detailed engineering and drawings

B. PRECAST CONCRETE SHELL
Size: (1) RCS 1430 Light Weight Precast Concrete POE Precast Office Building
Outside Dimension: 30’ Long x 13’ 8” Wide x 10.1’ High
Finished Inside Dimension: 29’ Long x 12’ 8” Wide x 9’ High
Weight: Approximate finished weight: ~82,700 pounds
Specifications:
Floor load: 200 PSF
Roof load: 60 PSF
Wind load: 150 MPH, Exp “C”, I=1.15
Bullet Resistance: UL752 Level 4 Equivalent (.30-06 at 15 Ft.)
Fire rating: Two Hour Equivalent
Seismic Zone: Up to 50% Gravity acceleration per IBC2006. Higher ratings are available to 300% Gravity acceleration

C. FINISHES
Exterior Walls: Solid Precast Concrete, 4” Thick with Textured Thorocoat finish
Interior Wall & Ceiling: Nudo White 1/2“ FRP board
Insulation: R-11 in walls and ceiling
Floor: Vinyl composition tile with rubber base molding
Roofing: White Elastomeric coating
Stud Partition Walls: Restroom & Closet walls

D. DOORS AND OPENINGS
Doors: (2) 3’-6” x 7’-0” 16 gauge steel door with 14 gauge steel frame
Locks: High Security Lockset with changeable core and Panic hardware
Other Door Hardware: (2) NRP Stainless steel hinges, anti-pick plate; kick plate, hydraulic door closer, weather strip, aluminum threshold, door sweep
Door Hood: (2) 54’w x 30” d door rain hoods, (2) Door drip cap
Interior Doors: (2) 3’ x 7’ Interior steel doors with hardware
Windows: (5) 5’ x 4’ Shatterproof Tinted Windows rated 150 MPH with 1- 5/16” tempered, tinted, hurricane resistant glass

E. POWER
Power Service: 200A 1Ø 120/240V
Disconnect Switch: (1) SQ D, D224NRB, 200A Exterior Disconnect Switch
Main Distribution Panel: (1) SQ D NQ series, MB panel, 200A 1Ø, 40 space
Surge Suppression: (1) Raycap/AC Data B82XXR-G at MDP
Convenience Receptacles: (6) 20A, 125V
Dedicated Receptacles: (~32) 120V, 15A Receptacles
Exterior GFI Receptacle: (2) 20A, 125V

F. ENVIRONMENTAL SYSTEM
HVAC: (1) 3 Ton, 240V, 1Ø wall mounted HVAC system
Controls: (1) Auto heat/cool thermostat controller
Restroom Exhaust fan: (1) Restroom exhaust fan

G. ALARMS
Alarms: (1) 25 pair split 66 block in storage room with intrusion smoke

H. LIGHTING
Interior:
(4) 4’ 2 tube Lithonia fluorescent light fixtures with acrylic lens covers
(2) 2’ x 2’ surface mtd fluorescent fixtures
Exterior: (2) 100W HPS Exterior light with photocell Lithonia TWA series
Emergency: (2) Emergency fixture with dual flood lights
Switches: (2) 20A light switches

I. GROUNDING
Grounds: Standard Commercial service grounding per NEC.

K. ADDITIONAL ITEMS
Telco, Computer, Radio: Install other conduits only as required
Counter: Plastic laminate counter with ledge
Storage shelves/Cabinet: Plastic laminate storage shelves in storeroom & storage cabinet in restroom
Restroom: Block outs for plumbing & floor drain provided by Oldcastle
IT equipment box/cabinet: IT equipment box/cabinet in storage room

Find out more about Oldcastle Precast Concrete Building Solutions

Download Full Case Study