November 12, 2021

Westminister Presbyterian Church
Portland, Oregon

Westminister Presbyterian Church<br> Portland, Oregon

As part of a soil investigation for the Westminster Presbyterian Church in Portland, Oregon, Torrent Resources, an Oldcastle Infrastructure company, was awarded the contract to develop and manufacture a storm water capture and infiltration system using the MaxWell Plus drywell. Oldcastle was able to showcase its ability to develop a greener and customized solution to converting the church parking lot using low impact development (LID) principles, that saves the client effort, time and money. Torrent Resources’ MaxWell drywell allowed the client to reinforce and improve their existing infrastructure for a reliable solution.

THE CHALLENGE

The soil investigation for the Westminster parking lot found that the site was underlain by at least 30 feet of clay and silt. As a result, this was creating unideal conditions for infiltration and LID designs.

Oldcastle was selected for the contract to complete the church parking lot update. A second inspection beyond 30 feet was required to gather new geotechnical information to ensure the MaxWell Plus drainage system was the right infiltration BMP.

THE SOLUTION

The client installed the MaxWell Plus drainage system to provide infiltration, citing a number of important factors:

| High storm water storage volume of 5,733 CF

| Ability to pre-treat storm water twice for constituent removal

| Field-proven efficiency

| High quality standards

Oldcastle was contracted to drill the MaxWell drywell to a depth of 57 feet, which was completed in a highly permeable layer of sand and gravel to make for a successful LID project.

The post construction percolation test yielded an in-situ flow rate of 0.46 CFS (206 gpm), which was more than 3 times greater than the design percolation rate.

BENEFITS

QUICK TO INSTALL

| Oldcastle Infrastructure’s BioPod was quick, easy and safe to install on-site for Apple Valley Construction. Using BioPod in place of the well-established competitor’s product allowed for all three units to be installed in just 13 hours, saving the contractor a significant reduction in labor time.

SUPERIOR QUALITY

The Westminster Presbyterian Church parking lot update was an excellent example of robust pre-treatment for influent storm water. As materials become permeable, a deep infiltration system from MaxWell drywell systems is key to a reliable solution.

A RELIABLE SOLUTION ON A TIGHT TIMELINE

Oldcastle exceeded performance expectations for the client and the job site. The MaxWell Plus system was installed and tested in less than one week so as not to impact the project schedule, making it the most feasible, constructible, and cost effective solution.

“The product offers field-proven efficiency and is the overwhelming choice of specifying engineers in the private sector.”

VLMK Consulting Engineers

Jurisdiction: City of Portland DES

Developer: Westminister Presbyterian Church

Civil Engineer: VLMK Consulting Engineers

Solution: (2) Maxwell Plus – Double Wall

Stormwater Volume: 5,733 CF