Seattle, WA PerkFilter® Installation
WATERFRONT ALASKAN WAY
The all-new Seattle Waterfront is set to change the entire landscape of the city, finally connecting the downtown and historic...
Cypress Street Stormwater Solutions
The challenge Frequent and excessive stormwater runoff was overwhelming the heart of downtown Tampa due to its outdated storm drainage...
BioPod™ System with StormMix™ Media – Customized Stormwater Biofiltration
During the development of a large commercial warehouse, tight site constraints made it nearly impossible to install a standard configuration...
Concrete Pipe Fault Line Solution
Title of the document Thriving and bustling Harris County is the most populous county in Texas. To plan for continued...
Baltimore MTA Railway Project | Cable Management Solution
Baltimore MTA was developing a brand-new light rail system to alleviate vehicular traffic and move customers faster through the city....
Golden Leaf Rural Broadband Project
North Carolina DESIGN & CONSTRUCTION TEAM General Contractor: Commscope Owner: MCNC Precaster: Oldcastle Infrastructure Manufacturing Facility: Oldcastle Infrastructure, Newnan, Georgia New fiber build installation...
High Volume StormCapture® Detention System
While constructing a new e-commerce distribution center, our client turned to Oldcastle Infrastructure for a stormwater management solution and underground...
Pepin Creek Fish Passage | Split Box Culvert Solution
The Washington State Department of Transportation (WSDOT) has been working to remove fish passage barriers throughout western Washington since 2013...
Indian River Lagoon | Nutrient Separating Baffle Box® (NSBB®)
Stormwater runoff poses increasing challenges to cities, straining sewers and water treatment plants while polluting nearby water bodies. The Indian...