Case Studies
Sort by Categories:
![](https://oldcastleinfrastructure.com/wp-content/uploads/2024/06/Mallard-Creek-1.jpg)
Novel Mallard Creek Apartment Complex | StormCapture
In the bustling city of Charlotte, North Carolina, Crescent Communities embarked on the development of the Novel Mallard Creek apartment...
![MaxCapture](https://oldcastleinfrastructure.com/wp-content/uploads/2024/04/MaxCapture-768x384.png)
Nevada and Commonwealth Apartments | MaxCapture®
The Nevada Street and Commonwealth Avenue Apartments in Chandler, Arizona are newly constructed multifamily apartments that needed a solution to...
![Pentagon Renovation Program](https://oldcastleinfrastructure.com/wp-content/uploads/2024/04/Pentagon-Renovation-Program-768x384.png)
Pentagon Renovation Program | CUDO® Installation
The Pentagon Renovation Program (PENREN) was a long-term project by the U.S. Department of Defense to perform a complete top-to-bottom...
![Toyota of Lewisville StormCapture](https://oldcastleinfrastructure.com/wp-content/uploads/2024/03/Toyota-of-Lewisville-StormCapture-768x384.png)
Toyota of Lewisville, Texas | StormCapture
In a landscape where success is measured by innovation and overcoming challenges, our partnership with Toyota of Lewisville stands as...
![The Path to Efficient EV Charging Infrastructure](https://oldcastleinfrastructure.com/wp-content/uploads/2024/03/The-Path-to-Efficient-EV-Charging-Infrastructure-3-768x384.png)
EV Charging Station | Foundation Solutions
It may be early in the adoption curve for electric vehicles in the U.S., yet the timing is perfect for...
![Cable Management](https://oldcastleinfrastructure.com/wp-content/uploads/2024/02/Cable-Management-Solution-768x384.png)
Baltimore MTA Railway Project | Cable Management Solution
Baltimore MTA was developing a brand-new light rail system to alleviate vehicular traffic and move customers faster through the city....
![EV-Fast-Charger-Foundation](https://oldcastleinfrastructure.com/wp-content/uploads/2023/10/EV-Fast-Charger-Foundation-cropped-768x384.png)
Replenishh Parking Lot | EV Fast Charger Foundation
The Fast Charger Foundation has been selected and installed within a “Rapid Electronics” parking lot in Colchester. Working closely with...
![](https://oldcastleinfrastructure.com/wp-content/uploads/2023/05/indian-river-case-study-header-cropped-768x384.jpg)
Indian River Lagoon | Nutrient Separating Baffle Box® (NSBB®)
Stormwater runoff poses increasing challenges to cities, straining sewers and water treatment plants while polluting nearby water bodies. The Indian...
![](https://oldcastleinfrastructure.com/wp-content/uploads/2023/03/fish_passage-cropped.jpg)
Pepin Creek Fish Passage | Split Box Culvert Solution
The Washington State Department of Transportation (WSDOT) has been working to remove fish passage barriers throughout western Washington since 2013...