Overview

Why OneLift™

The OneLift™ Pump Station is designed with an integral valve vault built into the unused top portion of the wet well, which yields a single-structure product, that solves the problems of differential settlement found with the conventional 2-structure systems.

Features

  • Single Structure Design
  • Rounded-Corner Shape
  • Base/Bottom Section
  • Wet Well Riser Sections
  • Pre Assembled Equipment Package
  • Integral Valve Vault Section
  • Valve Vault Extensions

Benefits

  • Single structure: integral monolithic valve vault in the wet well top portion; Eliminates the need for 2-structure systems; Simple and rapid installation; Less excavation and a smaller foot print
  • Allows for thinner/lighter walls; Prevents solids accumulation; Near rectangular shape provides more storage volume
  • Five-sided durable construction with mono fillet and collar
  • Elevate access opening covers to grade; Increase wet well storage volume; Available sizes: 2', 3', and 4'
  • Includes all mechanical and electrical components prior to delivery; Oldcastle Infrastructure, or our licensed distributors, provide:= Product commissioning= Training= Complete package warranty
  • Seamlessly integrates with the wet well base and riser sections; Reduces footprint; Eliminates risk of differential settlement associated with two structure systems
  • Elevate access opening covers to grade; Risers are fabricated in standard lengths; Available sizes from 2' and 4'

Features

Components and Options

Pump Station

The OneLift™ by Oldcastle Infrastructure, provides a standard turnkey submersible pump station product with the distinction of having a sole-source point of responsibility. The OneLift™ Pump Station is designed with an integral valve vault built into the unused top portion of the wet well, which yields a single-structure product, that solves the problems of differential settlement found with the conventional 2-structure systems. In addition; the single-structure design significantly reduces the product footprint for sites with tight area restrictions, and reduces complexity, size and cost of the excavation. The OneLift™ has proven to significantly reduce the time required for site installation.

OneLift’s standard innovative design allows for quicker project documentation, faster product delivery and repetitive high quality manufacturing.

Valve Vault

The factory built OneLift™ pump station offers a monolithically cast valve vault, in what is typically an unused portion of the pump station. This results in a significantly smaller footprint – up to 50% smaller than conventional 2 structure pump stations – allowing it to fit tight sites. The innovative shape and structural design provides ample space for the interior valve vault, while increasing workable system volumes and decreasing the depth of the excavation. The integral valve vault also eliminates the risk of differential settlement that is inherently associated with two structure systems.

  • Single structure with integral valve vault
  • Valve vault cast within the structure; in normally unused area
  • Single structure means no differential settlement
  • Small footprint for tight sites
  • Patent Pending integrated valve vault section
  • Factory Pre-assembled equipment package and vale vault assembly
  • Quality controlled production of precast components
  • Engineered for strength and efficiency

Base Module

The OneLift™ pump station structures have been designed with a patented base module that incorporates rounded corners and a sloped bottom to help facilitate flow and prevent solids accumulation. The base module structure also embodies buoyancy footing sizing and is designed to prevent flotation without requiring surface resistance or the weight of mechanical equipment when the ground water level is at finished ground surface. The factor of safety against uplift calculated as a ratio of the total resisting force (excluding skin friction and the weight of the equipment) to the total hydrostatic uplift force, is designed to be at least 1.15. The net uplift force shall be transferred to the anti-buoyancy collar.

ADVANTAGES

  • Buoyancy Footing Sizing designed to prevent flotation
  • Single body structure means a smaller excavation and footprint
  • Patent pending sloped bottom surface design minimizes solids accumulation
  • Patent pending rounded corners allow for thinner walls and minimize solids accumulation
  • Standardized design allows the base module to be a stockable item

Expanded Station

The OneLift™ pump station is factory built from stocked components of various heights to fit specific jobsite needs. Each station is factory pre-assembled and then partially disassembled for shipping. This prepackaged solution allows for field erection and reassembly in less than four hours. You get standard structural and mechanical components that allow for factory stocking, resulting in quicker station deliveries.

Valve Assembly

The OneLift™ pump station comes with a pre-assembled equipment package and valve assembly resulting in rapid installation with factory controlled quality components.

  • Flange Gaskets and Stainless Hardware
  • Bypass Piping and Valve Options
  • Stainless wetwell pipe supports
  • Stainless Pump Removal Guide Rail Assembly (standard)
  • Discharge Gauge Assembly Option
  • Standard CI Flanged Plug Valves-3″, 4″ & 6″
  • Standard L&W Flanged Chack Valves-3″, 4″ &6″
  • DI and/or PVC Pipe and Fittings
  • Station Wet Well Passive Vent
  • Junction Boxes and Control Panel Options
  • Level Control Devices
  • Removable Aluminum Trash Basket and Rail Assembly Option

Installation

TYPICAL 1 DAY INSTALLATION

The RC509 or RC611 pump station with integral valve vault is delivered to your jobsite as scheduled, pre-assembled, pre-tested and ready for installation. In the timeframe of just 4-hours, the pump station can be erected, “plugged-in” to your system piping and backfilled.

Case Study: RC509 delivered and installed in North Truro, MA
STEP 1
9:30am: Flat bed trucks arrive with pump station components. Contractor has excavation ready for pump station installation.Installation of a OneLift™ Pump Station Installation of a OneLift™ Pump Station 2
STEP 2
10:15am: Crane off-loads base section into excavation, additional sections are set; approximately one every 30-minutes.Installation of a OneLift™ Pump Station Installation of a OneLift™ Pump Station 2
STEP 3
11:15am: Crane sets long discharge pipes and pump guide rails (shipped loose) into station. Pump station top section with integral vault is set.Installation of a OneLift Pump Station Installation of a OneLift™ Pump Station 2
STEP 4
12:00pm: Minor reassembly of ship loose items are completed in two hours and backfill begins.

Specs & Downloads

Helpful Information

Multimedia

For More Information Please Contact: 

Ken Pasco
OneLift Sales Representative – East Region
860-214-4868
Ken.Pasco@oldcastle.com

 

David Reneson
Sales Manager – Mountain West
951-538-4493
David.Reneson@oldcastle.com

Product Filters
Clear Filters
Name Model Height Width Length Diameter Downloads Quote Generator
5’x9′ Pump Station – OneLift w/ Integral Valve Vault RC509 5’ 9’ View Add
6’x11′ Pump Station – OneLift w/ Integral Valve Vault RC611 6’ 11’ View Added

Loading...