Case Studies

Sort by Categories:

Westminster1 scaled

Westminister Presbyterian Church
Portland, Oregon

As part of a soil investigation for the Westminster Presbyterian Church in Portland, Oregon, Torrent Resources, an Oldcastle Infrastructure company,...
Seattle Waterfront PF CB 4 scaled

Seattle, WA PerkFilter® Installation
WATERFRONT ALASKAN WAY

The all-new Seattle Waterfront is set to change the entire landscape of the city, finally connecting the downtown and historic...
cypress street e1765565586477

Cypress Street Stormwater Solutions

The challenge Frequent and excessive stormwater runoff was overwhelming the heart of downtown Tampa due to its outdated storm drainage...
OLD21 NH 09 LPC Fredrickson Case Study

BioPod™ System with StormMix™ Media – Customized Stormwater Biofiltration

During the development of a large commercial warehouse, tight site constraints made it nearly impossible to install a standard configuration...
IMG 2947

Concrete Pipe Fault Line Solution

Title of the document Thriving and bustling Harris County is the most populous county in Texas. To plan for continued...
EV Cabinet Base System 1 cropped

Gas Station | EV Cabinet Base System

The EV Cabinet Base System has been specified by MFG to aid and enhance the installation of Power Cabinets, required...
EV Rapid Charger Foundation cropped

Rapid EV Charger Foundation

Transport for London (TfL) has invested in EV charging infrastructure to support the UK government goal of cutting 68% of...
EV High Power Charger Foundation

Gas Station | EV High Power Charger Foundation

Four High Power Charger Foundations have been selected to install one high power EV charger and three rapid EV charger...
EV-Fast-Charger-Foundation

Replenishh Parking Lot | EV Fast Charger Foundation

The Fast Charger Foundation has been selected and installed within a “Rapid Electronics” parking lot in Colchester. Working closely with...