Case Studies

Sort by Categories:

StormCapture® in Southeast Alabama
Transformational Stormwater Detention

As Auburn University continues to grow their phenomenal football program, a need developed to upgrade their football operations facility. This...

Sedona, AZ OneLift™ Pump Station

Oldcastle Infrastructure’s OneLift™ Pump Station offered a streamlined solution for the Sedona, Arizona, wastewater collection system by providing pump stations...

LAX ITF-WEST StormCapture® Installation

During construction of the Intermodal Transportation Facility–West (ITF-West) at the Los Angeles International Airport (LAX), Oldcastle Infrastructure delivered superior stormwater...

Rochester Vault Replacement

In Rochester, Minnesota, changes were being made to a street section that included the installation of a new roundabout. Incidentally,...

First Light Rail Track on a Floating Bridge

When faced with the significant design and construction challenge of building an electrified light rail line across Lake Washington, on...

Safe Wildlife Crossing in Monticello, Utah

The Oldcastle Infrastructure three-sided bridge offered a solution for the Utah Department of Transportation (UDOT) to create a large, open...
Duralite 2436 Unit Flush Cover

Northwest Communications Infrastructure Expansion & Upgrade

As part of a critical effort to deliver high-speed internet services and upgrade telecommunications infrastructure in remote areas of Wisconsin,...

THE STAKKABOX ULTIMA CONNECT CHAMBER WITH COMPOSITE COVERS

The STAKKABOX Ultima Connect Chamber proved to be a natural fit for a telecommunications infrastructure replacement, owing to its ease...

THE STAKKABOX ULTIMA CONNECT CHAMBER WITH COMPOSITE COVERS

A national railroad passenger authority put the STAKKABOX Ultima Connect Chamber to the test, and found it to be an...